Aircraft Logbook

Instruction manual

How to set up Aircraft Logbook and use it day to day, for owners, pilots, mechanics, inspectors and administrators. Print this page from your browser for a paper copy.

Pre-release edition, 15 November 2026. Questions: contact us.

1. Before you start

Aircraft Logbook keeps the airframe, engine and propeller logbooks of an aircraft electronically, in place of paper. It also keeps squawks, deferrals, due items, Airworthiness Directives and, if you want it, a flight log. Entries are signed with a passkey (Face ID, Touch ID or a device PIN) and lock once signed.

Pre-release edition. This manual describes the system as of 15 November 2026, ahead of its first public release. A few button names may differ in the released app. Features marked (coming) are not in the app yet.

Who is responsible for what

  • The owner or operator is responsible for keeping the aircraft airworthy (14 CFR 91.403). The pilot in command decides whether it is safe to fly (14 CFR 91.7).
  • The status the app shows is an aid worked out from the records. It is only as good as what has been entered.
  • Every signed record is a federal maintenance record. A false entry is a violation of 14 CFR 43.12.

What you need

You need Why
An iPhone, iPad (iOS 17 or later) or Mac (macOS 14 or later) The app runs on all three
An e-mail address you can open Sign-in, invitations and receipts all go to it; it must be confirmed
A device with Face ID, Touch ID or a PIN Your signing passkey lives there
An internet connection Signing and printing need the server; nothing is official until the server has it
Your FAA certificate details, if you sign maintenance or fly as PIC An administrator verifies them before you can sign

A mechanic who is only sent a job by e-mail needs no app: a web browser is enough (section 10).

The three rules the system never bends

  1. Signed records never change. A mistake is fixed by a new signed record that points at the old one, as in a paper logbook.
  2. The server decides. The app explains a refusal early, but the database makes the final check on who may sign what.
  3. Your records stay readable. A lapsed subscription never hides a record or blocks a squawk.

2. Getting set up

Setup takes four steps: an account, an organization, your certificate and a signing passkey. Do them in this order.

  1. Create your account. Sign up with your e-mail address and your full legal name. The name is printed beside every signature you make. Open the confirmation e-mail and confirm the address; nothing sent to you can be accepted until you do.
  2. Create an organization, or join one.
    • Create: choose the kind that fits (owner, flight school, Part 91K program, Part 135 operator, Part 121 operator, repair station, maintenance shop, other). The kind decides which features are switched on by default. You are asked for a starting deferral tracking number; use the next number from your paper system, or 1.
    • Join: an administrator invites you by e-mail. Accepting the invitation is your consent to be a member; you can also decline.
  3. Add your FAA certificate. Enter the certificate type and number (mechanic, IA, repairman, pilot). An administrator of your organization checks it against the FAA Airmen Inquiry and marks it verified. A verified certificate cannot be edited; a renewal is added as a new one.
  4. Register a signing passkey. The app asks for Face ID, Touch ID or your device PIN and creates a passkey that stays on your device. You get an e-mail alert whenever a passkey is added or removed on your account.

You can add a drawn signature image if you like the look. It is for appearance only and is never part of what is signed.

Good to know

  • You cannot change your own e-mail address inside an organization; ask an administrator.
  • If you sign in on a second device, register a passkey there too.
  • A person can belong to several organizations and is free in all of them. Only aircraft are billed (section 16).

3. Adding an aircraft

Take your time here: the starting totals cannot be changed once time is logged against them. Have the paper logbooks open and use the last paper entry as your reference point.

Steps

  1. Enter the registration. Type the N-number. Make, model and serial number fill in from the FAA registry download. Check the serial number against the data plate.
  2. If the aircraft already has a logbook here, you are told so. Each aircraft has one logbook in the whole system. Ask its keeper for access or for the logbook itself (section 14).
  3. Choose the time basis: tach, Hobbs or air time. Pick the one your paper records use.
  4. Enter the starting totals. Total time in service and the meter reading must be from the same moment. A constant gap between them (for example 67.0 hours) is normal. Enter landings, and set "as of" to the date of the last paper entry.
  5. Read "Check Before Adding" and the second confirmation. They show exactly what will be recorded.
  6. Add the engine and propeller. For the engine: time since new, time since overhaul, TBO hours and TBO calendar months. For the propeller: total time and time since overhaul. Each has its own confirmation.
  7. Enter each "last done" once. Annual, 100-hour, ELT, transponder and altimeter tests, and any others that apply. The app shows the resulting next-due date before you save.

If you made a mistake

  • An aircraft added by mistake can be deleted whole for 2 hours after it is added, as long as nothing in it has been signed.
  • Adding a backup address, making a printout or creating a share link ends that 2-hour window. Leave those until you have checked the setup.
  • Engine and propeller starting times can be corrected only until something is counted from them.
  • Work dated before the starting total is not entered as a new entry. Bring it in as a "last done" date or as a filed paper record (section 11).
  • A "last done" typed wrong can be taken back by an administrator with a reason (screen coming).

What cannot change later

Once any record is signed, the aircraft's identity (make, model, serial number) is frozen. A new N-number is handled by Change Registration, a log entry an administrator signs. Earlier records keep the old number and still verify.

4. Finding your way around

On iPhone the app has five tabs along the bottom. On iPad and Mac the same places are in the sidebar, and "+" is in the toolbar.

Tab What is there
Home The status panel for your aircraft, entries waiting for a signature, squawks that need someone, items due soon
Logbook The records, split into Airframe, Engines, Props and Deferred, with a card for each engine and propeller
New (+) Tiles for everything you can add: an entry, a squawk, a flight, a VOR check and so on
Aircraft Your aircraft list, each aircraft's details, due list, people and settings
Me Your profile, certificates, passkeys, subscription and Report a Problem

Home follows your role

Home opens on what your role needs first: an owner-pilot sees status, a mechanic sees work waiting, a manager sees the fleet. If you hold more than one role, a Flying · Maintenance · Fleet switcher appears. The view is a convenience only. It never changes what you are allowed to do.

The status panel

Panel Meaning
Green Airworthy by the records: nothing overdue, no open grounding squawk
Yellow-green Airworthy with deferred items; the count is shown
Amber or orange Restricted, or records incomplete; the reason is listed
Red Grounded; the reason is listed

Reasons are listed most serious first. Tap a reason to open the item behind it.

Times

Each aircraft shows airframe total time beside the meter reading, each engine's total time and time since overhaul, each propeller's total time and time since overhaul, and hours remaining to TBO. Dates and times are shown in the aircraft's own time zone.

5. Flights and time

A flight is not a logbook entry. The flight log is optional: an administrator switches it on or off for the organization. It is off by default for repair stations and maintenance shops.

With the flight log on

  1. Tap New, then the flight tile.
  2. Enter the meter reading out and in, the times, and the landings.
  3. Save. Hours are worked out from the readings and added to the airframe, engines and propellers.

The system checks each flight as you save it:

  • A reading can never be lower than the one before it.
  • A flight must move the meter, and no further than its own out-to-in clock time allows. This catches transposed digits.
  • The same flight entered twice is refused.
  • A flight entered late is accepted if its readings fit between the flights around it.
  • Guests cannot log flights.

A flight entered wrong is voided, never deleted. The void stays in the history.

With the flight log off

Total time comes from the meter reading the mechanic records on each maintenance entry. Every entry on a tach or Hobbs aircraft must carry the reading the mechanic saw.

Replacing a tach or Hobbs meter

Record the change on the signed maintenance entry for that work: the old meter's final reading and the new meter's first reading. Airframe total time carries on unchanged.

Trip pages (operators)

A trip page groups a day's legs under one pilot in command.

  1. A member opens the page. The PIC must be a current member with the pilot role.
  2. Legs are added as they are flown.
  3. The PIC closes and signs the page. The current maintenance release is shown on it, read-only.

Choosing a different PIC and adding crew from a list is coming; today the person who opens the page is its PIC. A signed page is corrected with Correct This Page… (section 9).

VOR checks

Record a VOR check from New and sign it (14 CFR 91.171). The check is good for 30 calendar days, and Home shows when it runs out.

6. Squawks and deferrals

Any member can report a squawk, including a pilot from the cockpit. Reporting stays available even if the subscription has lapsed.

Reporting a squawk

  1. Tap New, then the squawk tile, and pick the aircraft.
  2. Describe what you found. Add a photo if it helps.
  3. Sign it. The signature says you reported it; it approves nothing.

The aircraft's status updates at once. A squawk that affects airworthiness grounds the aircraft until it is fixed or properly deferred.

Fixing a squawk

Open the squawk and choose Fix This Squawk. The corrective entry names the squawk in its signed text, and the return-to-service signature closes it. A squawk written against an inspection can be corrected only by a maintenance person's approved work.

Deferring a squawk

A deferral starts from the squawk. Choose the method that applies:

Method Who typically authorizes Deadline
MEL Pilot or maintenance, under the operator's approved MEL Worked out from the category, in calendar days
14 CFR 91.213(d) Pilot or maintenance; the eligibility statement is part of what is signed As stated in the deferral
CDL or NEF As the organization's own item list allows The item's limit: days, hours, cycles or none
Deferred maintenance item Maintenance As stated in the deferral

Deadlines are calculated, never typed. Every deferral gets a tracking number automatically from one sequence per organization.

If a deferral is wrong

A wrong deferral is corrected by a new deferral that names the one it replaces and says why. It keeps the original's application date. A pilot may correct his own 91.213(d) deferral; an MEL correction is made by a maintenance person. (The mechanic's "Correct this deferral…" screen is coming.) Deferring the same squawk again in any other way counts as an extension and is limited.

A squawk that should never have been written is marked entered in error (section 9).

7. Maintenance entries and signing

An entry is written as a draft, reviewed, then signed. Signing locks it for good.

Writing an entry

  1. Tap New, then the entry tile, and pick the aircraft.
  2. Choose the kind of entry: maintenance, annual, 100-hour, major repair or alteration, AD compliance, overhaul, or preventive maintenance. The form asks for what that kind must contain under 14 CFR 43.9 or 43.11 and supplies the required wording.
  3. Enter the date of the work and the meter reading you saw. The reading is required on a tach or Hobbs aircraft.
  4. Describe the work. Attach photos, FAA Form 337, 8130-3 tags or work orders. Attachments are JPEG or PDF; photos are cropped and their location data removed.
  5. Under This work satisfies…, tick the due items the work completes (an annual, an AD, an oil change).
  6. Save. The entry is a draft until signed, and a draft can be edited or deleted.

Signing

  1. Open the draft and choose to sign. If you are not allowed to sign it, the app says why before any prompt.
  2. Read the summary. It is the exact text you are signing. Read any warnings shown.
  3. Confirm with Face ID, Touch ID or your PIN.
  4. The signature must reach the server within 10 minutes. Once it does, the record locks.

Two kinds of signature

  • Performed the work states that you did the work. If the draft is edited afterwards, this signature is superseded and you sign the current text again. You can Take Back This Signature until the entry is approved.
  • Approval for return to service approves the work and locks the entry. An inspection may instead be signed as disapproved, with its list of discrepancies.

Who may sign what

The system applies the rules below from your verified certificate. Your certificate must be current on the day you sign and held on the date of the work.

Work Signs the approval
Annual inspection Mechanic with Inspection Authorization
100-hour inspection, maintenance, AD compliance Certificated mechanic (A&P), or a repair station
Preventive maintenance (Part 43 Appendix A(c)) The pilot who did it on his own aircraft, or a mechanic
A record that approves nothing (a note, a filed paper record) Any member

Preventive maintenance by a pilot

A pilot approving his own preventive maintenance must pick the Appendix A(c) item (1 to 32) from the list; it is printed in the signed text. Such an entry never satisfies an AD, an inspection or any item that grounds the aircraft. It can satisfy an organization's own advisory or restricting item, such as an oil change.

After you sign

  • The service countersigns the signature and gets an independent time-stamp for it.
  • You receive a receipt by e-mail. It has an I didn't sign this button that works for 12 hours; pressing it locks your passkey, flags the signature and alerts the administrators.
  • The owner's backup addresses receive a fresh copy of the logbook (section 12).

8. Due items and Airworthiness Directives

The due list shows every item with its last-done date, its next-due date or hours, and what happens when it runs out.

What is tracked for you

When an aircraft is added, the items that apply to it are created from its details and equipment:

Item Rule When it runs out
Annual inspection 14 CFR 91.409(a) Grounded
100-hour inspection, where it applies 91.409(b); up to 10 hours over is deducted from the next Grounded
ELT inspection and battery 91.207 Restricted
Altimeter and static system test 91.411 Restricted
Transponder test 91.413 Restricted
VOR check 91.171 Restricted
Airworthiness Directives Part 39 Always grounded (39.7)
Engine and propeller TBO, life-limited parts Manufacturer limits; 43.10 As set for the item

Your own items

An administrator can add any recurring item (an oil change, a hose replacement) with an interval in hours, days or calendar months. Choose what happens when it runs out:

  • Grounded — only a maintenance person's approved work can sign it off.
  • Restricted — you write the restriction in your own words.
  • Advisory — a reminder only.

A pilot's preventive maintenance can sign off a restricted or advisory item, never a grounding one.

Recording that an item was done

  • New work: tick the item under This work satisfies… on the entry before it is signed. The item resets when the approval is signed.
  • Work already in the paper logbook: open the item and enter Done on. The next-due result is shown before you save. Only one paper date per item per day is accepted.

An inspection program (progressive, AAIP or an operator's program) with no items set up reads records incomplete, not airworthy.

When something is overdue

The aircraft reads grounded or restricted until the work is signed. To move it for maintenance under an FAA special flight permit, choose Special Flight Permit… on the due list and enter the permit as issued: number, route, last day, conditions and the overdue items it covers. Once signed, those items read restricted until the permit ends. Anything the permit does not name still grounds.

Airworthiness Directives

  • ADs come from a shared catalog built from the Federal Register, which starts in 1994. Older ADs are entered by hand.
  • Suggestions by make and model are hints. They can miss an AD or include one that does not apply, so a person confirms each one.
  • "Doesn't apply" is a signed determination by an A&P, an IA or a repair station.
  • Compliance is recorded on a signed entry and must state the method.
  • The AD status report lists each AD with its method, next due, or the signed determination (91.417(a)(2)(v)).

The AD list screens (add, search, "doesn't apply", record compliance) are coming in the app; the rules above are already enforced by the server.

9. Fixing mistakes

Nothing signed is ever edited or deleted. Each kind of mistake has its own signed way of being put right, and the original stays in the history.

The mistake What to do Who
A draft is wrong Edit it or delete it Its author
A signed entry has wrong text or a wrong reading Write a correction that points at the original and sign it. A corrected reading replaces the original's. The organization that signed the original
An entry was signed on the wrong aircraft Write a correction that withdraws the original. A withdrawn entry approves and satisfies nothing. The organization that signed it
A flight was logged wrong Void it and log it again The person who logged it, or an administrator
A signed trip page is wrong Correct This Page…: give the reason, name the real PIC, mark a leg as not flown or logged twice, or set the landings right. Sign the correction. The page's PIC or an administrator
A squawk should never have been written Mark it entered in error, with a reason, and sign. Possible only while nothing has been done about it. Its reporter or an administrator. On a Part 121 or 135 aircraft: an administrator, mechanic or inspector
A deferral is wrong A new deferral that names the one it corrects (section 6) Maintenance; a pilot for his own 91.213(d) deferral
A paper "last done" date was typed wrong An administrator takes it back with a reason (screen coming) Administrator
A signature on "performed the work" was a mistake Take Back This Signature, until the entry is approved The signer
Someone signed as you Press I didn't sign this in the receipt e-mail within 12 hours. After that, tell your administrator and support. The named signer
An entry signed by a previous owner's mechanic looks wrong Your mechanic adds a signed note about it (screen coming). Only the organization that signed an entry can correct it. The current keeper's mechanic
The aircraft was added by mistake Delete it within 2 hours (section 3) Administrator

An entered-in-error squawk grounds nothing and shows as an advisory on the status for 30 days. Corrections are listed on the record they correct, so a reader always sees both.

10. Outside mechanics

A mechanic who is not a member of your organization can work on your aircraft in two ways. Neither costs the mechanic anything.

Invite a guest mechanic

Use this for a mechanic who has the app and will do several jobs.

  1. An administrator opens the aircraft's people and invites the mechanic by e-mail, with an end date 1 to 90 days ahead.
  2. The mechanic accepts, adds his certificate and registers a passkey if he has not already.
  3. He sees and signs for that aircraft only. A second invitation adds another aircraft with its own end date.

A guest cannot log flights. Before every guest signature the app shows a federal-records warning. Ending a guest's access in Members ends it for all his aircraft. A mechanic who works across your fleet regularly is better added as a member.

E-mail a job, signed on the web

Use this for a single job. The mechanic needs only a web browser.

  1. An administrator sends a work request for the aircraft, usually from a squawk, to the mechanic's e-mail address.
  2. The mechanic opens the link, signs in or sets a password, and accepts the job.
  3. He enters his certificate and creates a passkey on his own phone or computer.
  4. He writes the entry, reviews the exact text and signs.

His access to that aircraft ends 24 hours after the work is signed. A request can be cancelled before it is accepted. A second request for a different squawk stands beside the first; sending again for the same squawk replaces the earlier link.

A correction to an entry signed on the web is made in the app today; correcting from the web page is coming.

11. Paper records

Your paper logbooks remain the record of everything before the starting date. Keep them. The system gives you four ways to bring paper in.

Scan the old logbooks

Upload scans of the paper logbooks as PDF or JPEG. Each scan is stored with where it came from and a fingerprint (SHA-256), and its pages can be searched by text. A large scan is stored in parts of up to 12 MB, cut between pages. An engine's or propeller's scans stay with that part when it moves.

Enter "last done" dates

For each due item, enter the date and hours it was last done from the paper logbook (section 8).

File a hand-signed paper entry

When work is signed on paper after you have started, for example by a shop that does not use the system:

  1. Create an entry and mark it as a paper original.
  2. Attach the scan of the signed page.
  3. Sign it as filed. Filing approves nothing and needs no certificate; it records that the paper exists and what it says.

An administrator decides which roles may file paper records.

The first 30 days: deferrals and releases from paper

For 30 days after an aircraft is added, an administrator can enter open deferrals and past maintenance releases from the paper records. Tick This deferral is from the paper records, or choose Enter a Release from the Paper Records…, and give the paper's date, who signed it and where the paper is kept. These are filed, not authorized. A release entered this way is history and never becomes the current release. After 30 days this is refused.

12. Printouts, verification, sharing and backups

Every copy that leaves the system can be checked against the signatures, by anyone, without an account.

Printing

Choose Print logbook on the aircraft. The PDF is made by the server, contains signed records only, and lists any former registrations. Printing an engine's or propeller's own logbook is supported by the server; its button is coming.

Checking a printed page

Every page carries a QR code. Scanning it opens a page at aircraft-logbook.com that re-checks each signature on that printed page and says whether anything newer has been signed since it was printed. A withdrawn entry is shown as withdrawn.

Checking a file with no network

The free offline checker at aircraft-logbook.com/verify-tool checks any export, backup or receipt in your browser. It needs no account and works with the network off, so the records can be verified without relying on this company.

Sharing for viewing

Use this for a pre-purchase review, an insurer or an inspector.

  1. Choose Share for viewing on the aircraft.
  2. Pick how long the link lasts: 7, 30 or 90 days.
  3. Copy the link when it is shown. It is shown once.

The viewer sees the records read-only, with each signature checked in their own browser, and can download a PDF. You can see how many times the link was opened and revoke it at any time. A share is never a transfer.

Backup e-mails

  1. Add a backup address on the aircraft. Any address will do: your own, a partner's, your shop's.
  2. The address receives a confirmation e-mail and must confirm.
  3. After every signature, the complete logbook is sent to each confirmed address as a PDF plus a data file the offline checker can verify.

Large attachments follow in further e-mails, oldest first. Once a month the backup lists every file kept for the aircraft with its fingerprint, and an administrator can have the files sent again.

13. People and roles

A role decides what a member may do in the organization. What a member may sign is decided separately, by his verified FAA certificate.

Role Can do
Administrator Everything a member can, plus: invite and remove people, verify certificates, add aircraft, change settings, manage billing, offer a sale
Mechanic Write and sign maintenance entries, deferrals and releases as his certificate allows
Inspector As a mechanic, plus inspections as his authorization allows
Pilot Log flights, report squawks, open and close trip pages, record VOR checks, defer as the rules allow, sign his own preventive maintenance
Viewer Read only
Guest One or more named aircraft until a date (section 10)

A member may hold more than one role.

Administrator tasks

  • Invite a member: enter the e-mail address and role. The invitation waits until the person accepts it from an account with that confirmed address.
  • Verify a certificate: look the person up in the FAA Airmen Inquiry, compare the certificate, and mark it verified. Until then the person cannot sign anything that needs it.
  • Remove a member: his past signatures stay valid and stay in the record.
  • Settings: switch the flight log on or off, require a maintenance release before flight, choose who may file paper records, move the deferral tracking number forward.

Leaving

A member can leave an organization. An administrator must give up the administrator role first, then leave. Keep at least two administrators so the organization is never locked out.

14. Selling, buying and logbook requests

Records follow the aircraft, engine or propeller. Each record keeps the name of the organization that signed it, and whoever holds the aircraft now reads the whole history.

Selling

  1. An administrator offers the logbook to the buyer by e-mail. The option sits in a submenu on purpose and asks you to have signed in within the last 10 minutes.
  2. The buyer accepts the offer from an account with that e-mail address.
  3. The seller signs the release and the buyer signs the acceptance (14 CFR 91.419). The logbook then belongs to the buyer's organization.

Installed engines and propellers go with the aircraft. A spare engine or propeller can be sold on its own the same way. Do not log time between the release and the acceptance.

After the sale the seller keeps a read-only copy of the records it signed for at least 2 years (the Previously Owned screen is coming).

When support releases the sale

A sale waits for a support check of the bill of sale when the selling organization has more than one administrator, lost an administrator in the last 30 days, or is selling to one of its own administrators. Upload the bill of sale (FAA AC Form 8050-2 or equivalent). Support compares it with the FAA registry and normally answers within one business day.

The aircraft's logbook is kept by someone else

When you add an aircraft that already has a logbook here, you can:

  • Ask for access — to read it, for example before buying.
  • Ask for the logbook — the keeper then transfers it to you with a signed release.

A request expires after 30 days, and you can have at most 5 waiting.

Ownership claims

If the keeper declines or does not answer within 14 days, you can file an ownership claim.

  1. Upload your evidence: the bill of sale, the FAA registration or application (AC Form 8050-1), and for an estate the court papers naming who may sell.
  2. The keeper's administrators are told and have 14 days to object.
  3. Support reviews the documents and approves or rejects, with the reason, to both sides.
  4. If approved, a transfer opens that you accept with your passkey.

Support checks that the documents are complete on their face. It does not decide who owns an aircraft; a dispute between two parties with papers is for them or a court.

If the keeper cannot respond at all (the sole owner has died, or the company is dissolved), write to support with the proof. Support can then remove the waiting periods.

Retiring a logbook

An aircraft that is destroyed, exported or permanently withdrawn is closed with Retire This Logbook, a log entry an administrator signs. A retired logbook can be restored by another signed entry.

15. Charter and airline operators

Organizations created as Part 135 or Part 121 operators get maintenance releases, CDL and NEF deferrals, and trip pages in addition to everything above.

Maintenance releases

A maintenance release (14 CFR 135.443, 121.709) is its own signed record, found on the aircraft's Release tab.

  • A mechanic or repairman signs it. Releases are numbered in one sequence per organization.
  • Each aircraft has one current release. It stops being current as soon as work is signed or a squawk is reported after it.
  • An administrator can require a release: with that setting on, an aircraft with no current release reads grounded.
  • The app warns if you sign a release while a squawk has been written but not yet signed.
  • No release can be signed while the aircraft is on a special flight permit.
  • Trip pages show the current release, read-only.

MEL, CDL and NEF deferrals

  1. An administrator sets up the organization's CDL and NEF item lists. Each item carries its limit: days, hours, cycles or none.
  2. To defer, open the squawk, choose the method and pick the item.
  3. The deadline is worked out from the item and shown. The deferral receives the next tracking number when it is signed.

For a deferral agreed by phone with maintenance control, the pilot signs the deferral in the app and reads the tracking number back.

Inspection programs

An aircraft on an operator's inspection program must have its program items entered as due items. Until it does, its status reads records incomplete. Program items can be changed only by an administrator.

Coming for line pilots

A "Before you fly" Home (today's aircraft, its release, each deferred item with its placard and limit, today's trip page), a Tech log tab, a crew picker for trip pages, and "Defer under MEL" directly from the New sheet.

16. Subscription and billing

Only aircraft are billed: one price per aircraft per year, set by engine class. People, and organizations with no aircraft, are free.

Engine class Price per aircraft, per year (USD)
Piston $99
Turboprop $500
Jet $1,500

Every aircraft of a class costs the same. Each person gets one 30-day free trial.

Subscribing and managing

  1. An administrator opens the Subscription screen. It shows the bill as lines such as "2 × $99.00 a year".
  2. Subscribing opens a secure Stripe checkout page in the browser.
  3. Manage Billing opens the billing portal to update the card, see invoices or cancel. Cancelling takes effect at the end of the paid year.

Each aircraft's license is for the year. An aircraft added during the year is charged at once for the rest of that year. An aircraft that is sold or retired during the year gives no refund and no credit toward another aircraft. Cancelling stops the next renewal.

E-mails you will get

Billing e-mails come from billing@aircraft-logbook.com and go to the administrator who subscribed.

E-mail When
Receipt After each payment
Renewal reminder, with how to cancel 30 days before the yearly renewal
Payment failed At once; you then have 14 days to fix it
New records stop in 72 hours To every administrator, before a lapse

If the subscription lapses

New records stop. Everything else keeps working: reading, printing, verifying, backups already sent, and reporting squawks. An erroneous signed entry can still be withdrawn or corrected. Nothing is hidden or deleted.

17. Help and troubleshooting

What you see Likely cause What to do
"You can't sign this" before the Face ID prompt Your certificate is not verified, has expired, or does not cover this kind of work Read the reason shown; ask an administrator to verify the certificate, or have the right person sign
The signature is refused after Face ID More than 10 minutes passed, or the record changed while you were reading (for example a flight was logged) Open the record, review it again and sign
A meter reading is refused as too low Digits transposed, or a later reading is already on record Check the reading. The app asks "Is that reading right?" when it is below the latest one for the same day
A flight is refused It repeats the last reading, or it adds more hours than its out and in times allow Correct the readings or times
A date picker will not accept today Dates are judged in the aircraft's time zone, not your phone's Use the aircraft's local date
An e-mail did not arrive Spam filter, or the address is not confirmed Look for noreply@, records@ or billing@aircraft-logbook.com in spam; confirm your address
Two passkeys are offered An old passkey is still saved on the device Delete the old one in the Passwords app
A new phone The passkey is on the old device Sign in on the new one and register a new passkey; remove the old one
The aircraft cannot be deleted 2 hours have passed, or something in it is signed Use Retire This Logbook if the aircraft is gone (section 14)
No connection Signing and printing need the server Try again when online. Offline reading of cached logbooks is coming

Report a problem

Choose Me ▸ Report a Problem, or Report a Problem… on an aircraft, entry or squawk. Signed out, use aircraft-logbook.com/feedback.

  • You choose what to include: a copy of the logbook or the record, account details, device details, screenshots.
  • You can see when support opens a copy, and you can remove what you sent. Copies are deleted 90 days after the report is resolved.
  • Mark the report as a safety issue if the app could be showing a wrong airworthiness status. Those are answered first.

Support never changes your records from a report. You make the correction in the app, and support explains how.

Contact

  • Support: support@aircraft-logbook.com
  • Billing: billing@aircraft-logbook.com

Not yet in the app

These are finished on the server and waiting for their screens: the AD list and its actions, printing and sharing an engine's or propeller's logbook on its own, the Previously Owned view, signed notes on another organization's entry, offline reading and offline drafts, the trip page crew picker, taking back a paper "last done", and correcting an entry from the web signing page.

18. Training checklist

Each person works through the list for their role before signing a real record. An administrator keeps the completed lists with the organization's procedures.

Everyone

  • I created my account with my full legal name and confirmed my e-mail address
  • I registered a passkey on my own device and nobody else can unlock that device
  • I understand a signed record is a federal maintenance record and cannot be changed (14 CFR 43.12)
  • I know the receipt e-mail has an "I didn't sign this" button that works for 12 hours
  • I can find an aircraft's status and read the reasons listed
  • I can report a squawk and sign it
  • I know how to report a problem to support

Pilot

  • I can log a flight and I know a wrong flight is voided, not deleted
  • I understand the status is an aid and the PIC decides whether the aircraft is safe to fly (91.7)
  • I can record a VOR check
  • I know which deferrals I may authorize and how the tracking number is given
  • I know preventive maintenance needs the Appendix A(c) item and never signs off an AD or inspection
  • Operators: I can open, close and sign a trip page, and correct a signed one

Mechanic and inspector

  • My certificate is entered and an administrator has verified it
  • I can write an entry with the meter reading I saw and attach documents
  • I can link work to due items with "This work satisfies…" before signing
  • I know the difference between "performed the work" and "approval for return to service"
  • I can close a squawk with Fix This Squawk
  • I can write a correction and a withdrawal
  • I can record an AD determination and compliance with its method
  • Operators: I can sign a maintenance release and I know what ends it

Administrator

  • I can add an aircraft and I checked the starting totals against the last paper entry
  • I can invite members and guests and verify a certificate in the FAA Airmen Inquiry
  • At least two administrators exist
  • Backup addresses are added and confirmed for every aircraft
  • I can print a logbook and check a page by its QR code
  • I can create and revoke a share link
  • I can send a job to an outside mechanic by e-mail
  • I know how a sale works and when support must release it
  • I know what continues and what stops if the subscription lapses

19. Glossary and regulation reference

Terms

Term Meaning
Squawk A discrepancy report
Deferral A signed decision to leave a squawk open under a stated authority and limit
MEL / CDL / NEF Minimum equipment list / configuration deviation list / nonessential equipment and furnishings
RTS Approval for return to service
IA Inspection Authorization
Passkey The signing key kept in your device, unlocked by Face ID, Touch ID or PIN
Keeper The organization that currently holds an aircraft's logbook
Guest A mechanic given access to named aircraft until a date
Determination A signed statement that an AD does or does not apply
Withdrawn entry An entry a signed correction says should not have been made; it stays as history
Filed paper record A hand-signed paper entry scanned and recorded; filing approves nothing
Seller's copy A former keeper's read-only copy of the records it signed
Countersignature and time-stamp The service's own signature and an independent authority's time-stamp, added to every signature as evidence

Regulations the system applies

Rule Where you meet it
14 CFR 43.9, 43.11 The content and wording of maintenance and inspection entries
43.12 Signed records cannot be altered
43.3(g), 43.7(f), Part 43 Appendix A(c) Preventive maintenance by a pilot
Part 39 ADs; an overdue AD always grounds
91.7, 91.403 Responsibility of the PIC and of the owner or operator
91.171 VOR checks
91.207, 91.409, 91.411, 91.413 ELT, annual and 100-hour, altimeter and transponder items
91.213 Deferrals
91.417 What records are kept, and that they stay available
91.419 Records transferred at sale
135.443, 121.709 Maintenance releases
AC 120-78B Electronic signatures and electronic recordkeeping

The system is built around these rules. It is not approved or endorsed by the FAA; operators who need FAA acceptance of electronic records for their certificate follow their own approval process.